| The first day - a bonding agent goes down on top of the plywood |
 |
 |
 |
 |
 |
 |
| This is actually day 3 - on day 2 the wire mesh went down (see the small side table) and day 3 had the first layer of cement go down |
 |
 |
 |
 |
 |
| Day 5 - a third layer of cement goes down - on day 4 the second layer went down |
 |
 |
 |
 |
 |
| Day 6 - The color layer |
 |
 |
 |
 |
 |
| Day 7 - Staining |
 |
 |
 |
 |
 |
 |
| Day 9 - Two coats of epoxy on top |
 |
 |
 |
 |
 |
 |
 |